Pieper Holz GmbH
Gewerbegebiet
Im Westfeld 2
59939 Olsberg-Assinghausen
Tel: +49.2962 - 9711-0
Fax: +49.2962 - 9711-31
E-mail: post@pieperholz.de
Ordering a Catalogue
Industrial selling:
Mo-Fr: 8:00 AM-4:00 PM
Sa: 9:00 AM-11:00 AM
GFK Crawl Tunnel
Description
Accessing the tower’s sub-base can be done through our enclosed crawl tunnel which is built within an embankment. The surface which is made of glass fibre re-inforced plastics (GFK) guarantees circular and smooth usage. The flange on both sides facilitates assembly. The length depends on the size of the embankment. For safety reasons, at least two crawl tunnels are provided as a means of access. .
GFK Crawl Tunnel
Order number: 5.3.03.18
Engineering drawing PDF
Specifications
- Age Guide
- 3-14 years
- Required Space
- depends on length (L)
- External Dimensions
- L/W/H = L / 1,01 m / 1,01 m
- Heaviest Part
- Tunnel (L = 1,50 m), approx. 45 kg
- Largest Part
- Tunnel (L = 1,50 m):
1,50 m x Ø 1,00 m
- Assembly details
- - recyclable material
- shock-resistant