deutsch englisch
spanish french italian dutch portuguese russian

Ground Level Boarded-In Sub-Base

Description

Living in a cave, every child’s dream. The opportunity to build an adventure place, practically in the ground, can be done in the tower’s sub-base. At the same time, the tower’s sub-base is boarded off from the outside. A special foil is advisable in order to avoid directly touching the ground. Two tunnel entrances made from wooden panels, plastic or cement are provided. For light and also for safety reasons, we recommend that an open overhead slit of approx. 8cm wide is provided.


Ground Level Boarded-In Sub-Base
Order number: 5.3.03.16


Engineering drawing PDF

Specifications

Age Guide
3-14 years
Heaviest Part
Panel, depends on Ph and Width
Largest Part
Panel, depends on Ph and Width
Type of Ground
equals base element
Assembly details
- warp-free construction